Completed
Disaster Management Centre in Madona
44 Skolas Street, Madona
Construction period: 01.2024. – 03.2025.
Reconstruction of a public building (Group 3) with a total area of 1,397 m², including the modernization of premises and engineering systems to ensure functionality and infrastructure that meet modern requirements.
-
Type:Public building
-
Client:Nodrošinājuma valsts aģentūra
-
Architect:Būvdizains SIA
-
General contractor:Pillar Contractor SIA







