Disaster Management Centre in Madona

  44 Skolas Street, Madona
   Construction period: 01.2024. – 03.2025.
Design & Build     Construction     Design
Reconstruction of a public building (Group 3) with a total area of 1,397 m², including the modernization of premises and engineering systems to ensure functionality and infrastructure that meet modern requirements.
  • Type:
    Public building
  • Client:
    Nodrošinājuma valsts aģentūra
  • Architect:
    Būvdizains SIA
  • General contractor:
    Pillar Contractor SIA