Dailes Theatre Small Hall and Rehearsal Hall

  75 Brīvības Street, Riga
   Construction period: 03.2024. – 09.2025.
Reconstruction     Restoration
Pillar Contractor carried out the reconstruction of the interior spaces of Dailes Theatre, creating the New Hall with 366 audience seats and a fully functional Rehearsal Hall, while preserving the building’s historic architecture. The project included complex structural and engineering system reconstruction works, restoration solutions, and accessibility improvements, ensuring modern and functional cultural infrastructure without interrupting the building’s operation.
  • Type:
    Public building
  • Client:
    Dailes teātris SIA
  • Architect:
    Sudraba Arhitektūra
  • General contractor:
    Pillar Contractor SIA

Testimonial

Juris Žagars
Director of the Dailes Theatre, actor, entrepreneur and politician.