Skip to main content
Completed

Reconstruction of a sewage pumping station and sewage pressure main in Riga

  Brīvības gatve 433, Riga
   Construction period: 06.2021. – 08.2022.
Construction     Reconstruction
Pillar Contractor, as part of a supplier association, carried out the reconstruction of a sewage pumping station and the construction of a new sewage pressure main, ensuring significant modernization of the engineering infrastructure. The project included the construction of a pumping station with automated control and SCADA systems, the installation of new utility networks, and site improvement works, increasing the operational reliability and capacity of the system.
  • Type:
    Infrastructure
  • Client:
    Rīgas ūdens SIA
  • Architect:
    Akvateks
  • General contractor:
    Pillar Contractor SIA