Skip to main content
Completed

New Hanza infrastructure, Phase 3

  R. Hirša Street, Riga
   Construction period: 03.2019 – 03.2020
Construction
Latvian Construction Award of the Year 2020 in the category “New Engineering Structure”, 2nd place
Latvian Construction Award of the Year 2020 in the category “New Engineering Structure”, 2nd place
Construction of a new street network with underground utilities on Roberta Hirša Street, Riga.
  • Type:
    Infrastructure
  • Client:
    Pillar Development SIA
  • Architect:
    Pillar Architekten SIA
  • General contractor:
    Pillar Contractor SIA