Skip to main content
Completed

Disaster Management Centre in Kandava

  “Ūdenstornis Liepās”, Liepu Street, Kandava
   Construction period: 02.2022. – 04.2024.
Design & Build     Construction     Design
Construction of a public building with a total area of 808 m², providing modern infrastructure for carrying out disaster management functions, including the adaptation of premises and engineering systems to operational needs.
  • Type:
    Public building
  • Client:
    Nodrošinājuma valsts aģentūra
  • Architect:
    SIA Būvdizains
  • General contractor:
    SIA Pillar Contractor