Skip to main content
Completed

BKSB speedway stadium asphalt concrete surface and utility network renewal construction works – phases 1 and 2

  2 Eizenšteina Street, Riga
   Construction period: 12.2024. – In progress
Construction
The CSDD Biķernieki Complex Sports Base site is divided into two parts. The first part involves the construction of sewerage networks with stormwater drainage in the territory of the Biķernieki track. The second part involves the renewal of the speedway track surface using the recycling method.
  • Type:
    Infrastructure
  • Client:
    VAS “Ceļu satiksmes drošības direkcija”
  • Architect:
    Firma L4 SIA
  • General contractor:
    Pillar Contractor SIA