In progress

AmberBirch veneer production plant

  “Finieris”, Krustpils Parish, Jēkabpils Municipality, LV-5204
   Construction period: 04.2024. – In progress
Design & Build     Design
Expansion of the veneer production workshop over an area of 10,442 m2, reconstruction of part of the existing boiler house warehouse, construction of a new woodchip warehouse, installation of a prefabricated warehouse, placement of a prefabricated container-type modular building for the finished goods administration post and drivers’ rest needs, as well as reconstruction of the existing hydrothermal treatment basin for round timber with a change of function (the basin is intended to be converted into an external firefighting water reservoir).
  • Type:
    Infrastructure, Industrial building
  • Client:
    AmberBirch SIA
  • Architect:
    Pillar Contractor SIA
  • General contractor:
    Pillar Contractor SIA