Skip to main content
Completed

New Hanza Infrastructure Stage 1

  New Hanza area, Riga
   Construction period: 05.2016 – 05.2017
Construction
Best Building of the Year in Latvia 2019 in the “Engineering Structure” category, 2nd place
Best Building of the Year in Latvia 2019 in the “Engineering Structure” category, 2nd place
Construction of two streets with underground utility networks and two pumping stations.
  • Type:
    Infrastructure
  • Client:
    Pillar Development SIA
  • Architect:
    Pillar Architekten SIA
  • General contractor:
    Pillar Contractor SIA