Completed
New Hanza Infrastructure Stage 1
New Hanza area, Riga
Construction period: 05.2016 – 05.2017
Best Building of the Year in Latvia 2019 in the “Engineering Structure” category, 2nd place
Construction of two streets with underground utility networks and two pumping stations.
-
Type:Infrastructure
-
Client:Pillar Development SIA
-
Architect:Pillar Architekten SIA
-
General contractor:Pillar Contractor SIA



