Completed
Disaster Management Centre in Viļāni
Rīgas Street 53A, Viļāni
Construction period: 05.2024. – 06.2025.
Construction of a public building with a total area of 752 m², providing modern infrastructure for carrying out disaster management functions, including the adaptation of premises and engineering systems to operational needs.
-
Type:Public building
-
Client:Nodrošinājuma valsts aģentūra
-
Architect:7 A.M. SIA
-
General contractor:PIllar Contractor SIA
